Insurance Reinstatement
We carry out high-standard insurance reinstatement works across London and surrounding areas.
Our focus is like-for-like reinstatement in residential properties following escape of water, fire damage, impact damage, and structural failure.
We understand the difference between standard building work and insurance-led reinstatement. Our pricing, documentation, and execution reflect insurer requirements and loss adjuster expectations. We work with insurer-approved supply chains and are experienced in operating within structured reinstatement frameworks.
Types of Claims We Handle
- Escape of water damage
- Fire and smoke damage
- Leak damage and water ingress
- Ceiling collapse
- Damp and mould-related reinstatement
- Subfloor and flooring reinstatement
- Kitchen and bathroom reinstatement
- Damaged walls, ceilings, floors and joinery
Claim Support and Documentation
- Itemised quotations
- Photographic reporting
- Scope reviews
- Loss adjuster support
- RAMS and method statements where required
- Like-for-like reinstatement support
- Communication with homeowners, landlords, insurers, loss adjusters and managing agents
Housing Association, Council & Supply Chain Experience
AWJ Construction has delivered works within housing association and local authority housing environments across London and Essex, operating under structured compliance frameworks and coordinated supply chains.
- Responsive and planned maintenance works
- Insurance-led reinstatement projects
- Roofing and external envelope repairs
- Kitchen and bathroom replacement programmes
- Multi-property landlord refurbishment
We regularly operate in
- High-rise flats
- Third floor and above (no lift access)
- Congestion charge zones
- Permit-controlled areas
Our Approach
- Insurance reinstatement requires structure and clarity.
- Our process typically includes:
- Site inspection
- Review of loss adjuster report (where provided)
- Detailed written scope of works
- Like-for-like costed quotation with breakdown
- Supporting photographs
- Programme scheduling
- Staged execution
- Final sign-off
- All variations are agreed in writing.
- We prioritise documentation, communication and controlled execution.
- Standards & Compliance
- Fully insured
- RAMS provided where required
- Method statements available
- Clear stage payment structure
- Transparent cost breakdowns
Example Projects
- Insurance Reinstatement London
- Escape of Water Damage Repairs London
- Fire Damage Reinstatement London
- Water Damage Repairs London
- Insurance Repair Contractor London
- Kennington – Third Floor Flat (Escape of Water)
- Leak caused by external cladding failure
- Full bathroom strip-out
- Subfloor replacement
- Repairs to adjacent room
- Congestion zone logistics
- Like-for-like reinstatement
- Dalston – External Failure Causing Internal Damage
- Strip-out of affected areas
- Timber repairs
- Full redecoration
- Coordinated staged works
Why AWJ Construction
- Experience in high-end residential properties
- Structured, insurer-ready documentation
- Professional communication with adjusters and clients
- Controlled, detail-focused reinstatement
- London-based operational experience
- Familiarity with schedule-of-rates environments
Industry Recognition
- A W Jackson Construction LTD trading as AWJ Construction has been selected as a 2026 recipient in the BUILD Magazine Home Builder Awards (London category).
- The feature publication is currently pending release.
- This recognition reflects our structured approach to residential refurbishment and detail-focused execution.