CASE STUDIES

CASE STUDIES

Projects. Experience. Reinstatement.

Explore selected projects delivered by AWJ Construction, from completed insurance reinstatement works to major projects currently in progress across London.

COMPLETED PROJECTS

COMPLETED PROJECTS

A selection of completed projects demonstrating AWJ Construction’s approach to insurance reinstatement, damage recovery and high-standard building works.

Haggerston Wharf, London

Project Type

Serious Water Damage / Insurance Reinstatement

Contract value

£46,244.40

Loss adjuster

McLarens

Status

Completed

Hillside Gardens, E17

Project Type

Escape of Water Insurance Reinstatement

Contract value

£12,942

Insurer

Homeprotect

Status

Completed

CURRENTLY IN PROGRESS

COMPLETED PROJECTS

Our current insurance reinstatement projects demonstrate the scale and coordination involved in managing complex property damage and reinstatement works.

4 Campsbourne Well House, Cross Lane, London N8 7FY

Project Type

Escape of Water Insurance Reinstatement

Claim handler

McLarens

Contract value

£32,500 + VAT / £39,000 including VAT

Status

Ongoing

Scope summary

Concealed shower mixer and associated pipework leak causing trapped water within wall and floor construction. Works include full bathroom strip out, removal of affected wall and floor finishes, controlled drying and moisture monitoring, mould and biocidal treatment, insulation replacement, plumbing repairs, electrical attendance, floor and wall substrate reinstatement, tanking, complete bathroom wall and floor tiling, refitting sanitaryware and shower fittings, hallway wall repairs, ceiling repairs to the affected area below, decoration, testing and final moisture verification. This is a multi area insurance reinstatement rather than a simple bathroom repair.

Britannia Building, 12 Ebenezer Street, London N1 7PR

Project Type

Major Escape of Water Insurance Reinstatement

Claim handler

McLarens

Contract value

£32,500 + VAT / £39,000 including VAT

Status

Ongoing

Scope summary

Major coordinated escape of water reinstatement affecting multiple flats and communal areas. Works involve Flats 27 and 23 together with the affected communal hallway. The programme includes protection and mobilisation, controlled opening up, removal of damaged materials, mould remediation, professional drying and moisture monitoring, plasterboard and substrate repairs, flooring replacement, joinery repairs, kitchen removal and reinstatement where required, decoration, service checks, photographic documentation, snagging and final handover. The works are being managed as one coordinated reinstatement programme while maintaining separate cost records for the affected areas. Concealed shower mixer and associated pipework leak causing trapped water within wall and floor construction. Works include full bathroom strip out, removal of affected wall and floor finishes, controlled drying and moisture monitoring, mould and biocidal treatment, insulation replacement, plumbing repairs, electrical attendance, floor and wall substrate reinstatement, tanking, complete bathroom wall and floor tiling, refitting sanitaryware and shower fittings, hallway wall repairs, ceiling repairs to the affected area below, decoration, testing and final moisture verification. This is a multi area insurance reinstatement rather than a simple bathroom repair.

50 Ashbourne Close, London N12 8SA

Project Type

Escape of Water / Water Damage Reinstatement Following Bath Leak From Property Above

Contract value

£7,250 + VAT / £8,700 including VAT

Status

Ongoing

Scope summary

Water damage affecting the main entrance hallway, second hallway adjacent to the bathroom and bathroom ceiling. Works include property protection, controlled drying and moisture monitoring, removal of failed and blistered coatings, contaminated water cleaning, anti mould and biocidal treatment, localised solid plaster and skim repairs, electrical safety testing to water affected areas, stain blocking, priming and decorative reinstatement. The existing decorative finish is being reinstated to match the existing Farrow & Ball finishes as closely as reasonably possible. The programme also includes final moisture checks, cleaning, snagging and handover.